Machine Performance
Annular Thickness, Annulus, and Annular Space; Overcut; Slurry or Auger System; Cutter Wheel Design and Select; Slurry Separation Plant; Buried Objects and Obstruction; Steering....

Submittals
The contractor should submit the items listed in the specifications for review and acceptance by the engineer. The submittals are generally divided into preconstruction and postconstruction...

Shafts/Temporary Structures
Shafts should be of a size to accommodate the equipment and pipe selected and to allow for safe working practices. If the shaft must accommodate the permanent works, it is the contractor's...

Construction Support Services
A preconstruction survey of existing structures within the anticipated construction zone of influence should be conducted before any construction begins. A plan for structures that need...

Regulations
The contractor should meet federal, state, and local regulations. The contractor is responsible for jobsite safety....

Instrumentation and Monitoring
A detailed plan for monitoring possible ground surface movements caused by the microtunneling operations should be prepared. The plan is typically prepared by the engineer in consultation...

Restoration and Cleanup
The contractor should be responsible for site restoration and keeping the construction site clean, neat, and orderly at all times....

Measurement and Payment
The owner shall establish a bid schedule to obtain pricing for all work associated with the microtunneling installation. This bid schedule provides the bidders the opportunity to establish...

Notes on Heavy Lift Design
The interrelated activities and responsibilities of the various organizations involved in the lift design and offshore installation of topside facilities for an offshore platform are discussed....

Findings From a Joint Industry Study on Foundation Fixity of Jackup Units
During the design storm conditions the soil supporting jack-up unit footings may be close to, or at plastic failure. Accordingly, the use of elastic solutions to the problems of foundation...

Performance Limits for Deepwater Pipelines
This paper highlights the differences between onshore and offshore pipeline design. It then summarizes the results of combined external pressure, tension, and bending testing on full scale...

Extreme Wave-Force Calculation Procedure for 20th Edition of API RP-2A
The paper describes the revised guideline design wave force calculation procedure approved for the 20th edition of the API-RP2A WSD and the first edition of the API-RP2A LRFD and contrasts...

The Joint Industry Development of a Recommended Practice for the Site Specific Assessment of Mobile Jackup Units
The mobile self-elevating (drilling) unit, or jack-up, has been central to the exploration and development of offshore oil and gas reserves. In recent years there has been an increased...

A Simple Model to Predict Soil Resistance to Driving for Long Piles in Deepwater Normally Consolidated Clays
As the exploration and development for offshore oil and gas reserves moves into the deepwater environment of the continental slope, a good model is necessary to evaluate drivability of...

Scope
This chapter includes a brief summary of the scope of the document....

The Hail Problem
Unlike some other forms of precipitation, hail comes in bursts of short duration, falls over isolated and unpredictable locations, and usually occupies only a small percentage of the total...

Hail Concepts
Hail, the product of vigorous deep convection, requires those same conditions that are conducive to the development of thunderstorms. These conditions include water vapor, especially in...

The Design of Hail Suppression Operations
When hail suppression operations are being considered, it is already understood that hail damage is a significant problem in an area in which the political subdivision, organization, or...

Conduct of Operational Hail Suppression Projects
Those conducting hail suppression operations should be vigilant and always prepared to react when potential hailstorms begin to develop. In this chapter, some guidance is provided for...

Evaluation of Hail Suppression Efforts
The rationale for conducting project evaluations is to find out how successful the operations are in achieving the desired results. This assessment is more easily said than done. It is...

 

 

 

 